Resources » Published directions and notices
Published directions and notices
As part of its regulatory functions under the OPGGS Act and to increase transparency, NOPSEMA publishes directions, prohibition notices and improvement notices. These regulatory enforcement actions are published within 7 days and no later than 21 days of issuance and the provisions for publication do not apply to any other types of notices, letters or enforcement actions issued by NOPSEMA or NOPSEMA inspectors.
Published directions, improvement and prohibition notices will not be removed when they cease to have effect, however, in the event a direction/notice is the subject of external review it will be removed. NOPSEMA will ensure that as far as is reasonably practicable all personal information as defined in the Privacy Act 1988 is redacted from these documents prior to publication.
Under Part 6.2 of the OPGGS Act, NOPSEMA and the responsible Commonwealth Minister have powers to issue directions to petroleum or greenhouse gas titleholders. NOPSEMA can issue three types of directions: general directions, significant incident directions and remedial directions. The directions powers are used by NOPSEMA for enforcing compliance with the OPGGS Act and associated regulations. Failure to comply with directions is an offence.
A prohibition notice may be issued if a NOPSEMA inspector is satisfied on reasonable grounds that there is an immediate threat to the health or safety of any person or an immediate and significant threat to the environment. A prohibition notice stops the duty holder from continuing their activity and will only cease to have effect when a NOPSEMA inspector is satisfied adequate action has been taken to remove the threat specified in the notice. Failure to comply with a prohibition notice is an offence.
An improvement notice may be issued if a NOPSEMA inspector believes the duty holder or titleholder is contravening or has contravened a provision of offshore petroleum Commonwealth OHS or environmental law and as a result there is, or could be, a risk to the health and safety of any person or a significant threat to the environment. The notice will cease to have effect when the responsible duty holder or titleholder takes the action specified in the notice. Failure to comply with an improvement notice is an offence.
Sort published directions and notices
|
ID |
Type of notice |
Description |
Date issued |
Organisation |
Facility/Activity |
Notice |
Status |
|---|---|---|---|---|---|---|---|
|
781 |
OHS Improvement Notice |
Failure to prevent bullying behaviour and mitigate its consequences, unnecessarily exposing employees to the risk of psychological injury. |
19/02/2020 |
Teekay Shipping (Australia) Pty Ltd |
Dampier Spirit |
Open |
|
|
783 |
OHS Improvement Notice |
The operator has not taken all reasonably practicable steps to ensure, as a result of identified surface corrosion, plant and equipment is safe. |
14/02/2020 |
Vermilion Oil & Gas Australia Pty Ltd |
Wandoo B |
Open |
|
|
780 |
General Direction |
Increasing deficiencies with the Safety Management System in relation to the isolation of plant and equipment to conduct intrusive activities at the facility. |
22/01/2020 |
Shell Australia Pty Ltd |
Prelude FLNG |
Open |
|
|
779 |
OHS Improvement Notice |
Airborne hazardous chemical dust was not being controlled during chemical mixing at the manual hopper in the sack room and presented an occupational health risk to members of the work force. |
31/12/2019 |
Sedco Forex International Inc |
Development Driller 1 |
Duty holder has notified NOPSEMA that the notice has been complied with |
|
|
778 |
OHS Prohibition Notice |
Airborne hazardous chemical dust was not being controlled during chemical mixing at the manual hopper in the sack room and presented an occupational health risk to members of the work force. |
19/12/2019 |
Sedco Forex International Inc |
Development Driller 1 |
Closed |
|
|
752 |
OHS Improvement Notice |
Operator failure to take measures to implement an effective maintenance and inspection management program that adequately managed dropped object risks. |
07/11/2019 |
Woodside Energy Limited |
North Rankin Complex |
Closed |
|
|
775 |
Environment Improvement Notice |
Riser Turret Mooring may become a navigation collision hazard. |
23/10/2019 |
Woodside Energy Ltd |
Nganhurra Cessation of Operations |
Duty holder has notified NOPSEMA that the notice has been complied with |
|
|
774 |
OHS Prohibition Notice |
A failure to ensure safe work practices resulting in a drill line injuring a member of the workforce. |
10/10/2019 |
Diamond Offshore General Company |
Ocean Monarch |
Open |
|
|
772 |
General Direction |
Develop a plan to ensure the facility can safely enter an extended state of non-production. |
27/09/2019 |
Administrators of Timor Sea Oil & Gas Australia Pty Ltd (TSOGA) |
Northern Endeavour FPSO |
Open |
|
|
768 |
OHS Improvement Notice |
Failure to ensure workforce training and qualifications are maintained. |
25/09/2019 |
Teekay Shipping (Australia) Pty Ltd |
Dampier Spirit |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
764 |
OHS Improvement Notice |
Corrosion to deck grating creating risks to personnel on the facility. |
30/08/2019 |
Esso Australia Pty Ltd |
Bream B |
Open - Extended to 29/02/20 |
|
|
765 |
OHS Improvement Notice |
Corrosion to stairway creating risks to personnel on the facility. |
30/08/2019 |
Esso Australia Pty Ltd |
Bream B |
Duty holder has informed NOPSEMA that the notice is complied with. |
|
|
766 |
OHS Improvement Notice |
Failure to mantain the Brucker by not performing scheduled load testing to ensure it is safe. |
30/08/2019 |
Esso Australia Pty Ltd |
Bream B |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
767 |
OHS Improvement Notice |
Failure to inspect the number of points selected during the planning and approval phase as part of the piping inspection programme. |
30/08/2019 |
Esso Australia Pty Ltd |
Bream B |
Open - Extended to 30/04/20 |
|
|
761 |
Environmental Improvement Notice |
Produced water discharges contain concentrations of hydrocarbons above accepted limits. |
27/08/2019 |
Multiple titleholders |
Yolla |
Dutyholder has informed NOPSEMA the notice has been complied with |
|
|
753 |
General Direction |
TSOGA must not recommence hydrocarbon production operations at the facility until specific items listed in the direction have been completed. |
18/07/2019 |
Timor Sea Oil & Gas Australia Pty Ltd (TSOGA) |
Northern Endeavour FPSO |
Open |
|
|
754 |
OHS Improvement Notice |
Insufficient capability to fight fires on or in the vicinity of the M10 methanol laydown area. |
12/07/2019 |
Woodside Energy Limited |
Vincent FPSO |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
755 |
OHS Prohibition Notice |
Non compliances relating to corrosion issues at the facility that could lead to a major accident event causing multiple fatalities and environmental damage. |
10/07/2019 |
Upstream Production Solutions Pty Ltd |
Northern Endeavour FPSO |
Open |
|
|
746 |
OHS Improvement Notice |
Ineffective oversight, governance and control of maintenance and inspection of third party equipment could have resulted in a loss of containment, or ignition risk, and subsequently, a major accident event involving injury or death. |
13/06/2019 |
BHP Petroleum Pty Ltd |
Pyrenees FPSO facility |
Duty holder has informed NOPSEMA the notice has been complied with |
|
|
740 |
General Direction |
Address inadequate arrangements for measurement, management and reporting of produced formation water discharges. |
21/05/2019 |
Esso Resources Australia Pty Ltd |
Marlin, Snapper, Flounder, Tuna, West Tuna, West Kingfish, Central Fields and Bream |
Duty holder has informed NOPSEMA that the direction is complied with |
|
|
738 |
Environmental Improvement Notice |
Address ongoing inadequacies with oiled wildlife response arrangements under the oil pollution emergency plan. |
30/04/2019 |
Esso Resources Australia Pty Ltd |
Barracouta, Whiting, Flounder and Central Fields |
Duty holder has informed NOPSEMA the notice has been complied with |
|
|
741 |
General Direction |
Demonstrate commitment to retaining the facility's current registered operator while the facility is in use, until such time as a subsequent registered operator has a safety case accepted by NOPSEMA. |
26/04/2019 |
Timor Sea Oil & Gas Australia Pty Ltd (TSOGA) |
Northern Endeavour FPSO |
Open |
|
|
736 |
General Direction |
Take action to demonstrate oil spill response capability and financial assurance. |
02/04/2019 |
Timor Sea Oil & Gas Australia Pty Ltd (TSOGA) |
Northern Endeavour FPSO |
Closed |
|
|
737 |
Environmental Improvement Notice |
Systemic compliance monitoring issues lead to a number of breaches including acquisition of seismic data within the boundaries of a seasonal exclusion zone that was in place to protect internesting flatback turtles. |
28/03/2019 |
CGG Services (Australia) Pty ltd |
Davros Extension Multi-client 3D Marine Seismic Survey |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
728 |
Environmental Improvement Notice |
In the event of oil spill, increased exposure of spilled oil to the environment due to significant delays in the implementation of oil spill response strategies and techniques. This results from TSOGA’s insufficient capacity to coordinate and manage oil spill response due to arrangements with third parties for oil spill response strategies not being accessible or maintained. |
13/11/2018 |
Timor Sea Oil and Gas Australia Pty Ltd (TSOGA) |
Northern Endeavour FPSO |
Closed |
|
|
729 |
OHS Improvement Notice |
Risk of injury or death to personnel at the Montara WHP facility during cold gas venting activities from H3ST1 Well A & B annulus as a result of loss of containment of hydrocarbons and associated risk of fire and/or explosion. |
02/11/2018 |
PTTEP AA |
Montara Wellhead Platform |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
730 |
OHS Improvement Notice |
Risk of injury or death to personnel at the facility during Montara surface wells gas lift activities with personnel in attendance at the Montara WHP, as a result of loss of containment of hydrocarbons and the associated risk of fire and/or explosion. |
02/11/2018 |
PTTEP AA |
Montara Wellhead Platform |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
724 |
OHS Improvement Notice |
The Inergen system has not been demonstrated to be fit for purpose; recent equipment failures indicate that further failures may occur; and, the condition of the Inergen system cannot be effectively monitored and maintenance carried out, as a result of personnel being restricted from entering the Inergen room. As such there is reduced assurance that the Inergen system would operate as intended. |
15/10/2018 |
Woodside Energy Ltd |
Nganhurra |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
718 |
OHS Improvement Notice |
Lack of an acceptable static equipment corrosion assessment, maintenance & remediation plan represents a risk of equipment failure, resultant loss of containment of hydrocarbons, and the potential for explosion and fire. |
27/09/2018 |
PTTEP Australasia (Ashmore Cartier) Pty Ltd |
Montara Venture |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
719 |
OHS Improvement Notice |
Lack of an acceptable static equipment corrosion assessment, maintenance & remediation plan represents a risk of equipment failure, resultant loss of containment of hydrocarbons, and the potential for explosion and fire. |
27/09/2018 |
PTTEP Australasia (Ashmore Cartier) Pty Ltd |
Montara Venture |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
714 |
OHS Improvement Notice |
Inadequate management of risks associated with safety critical equipment could lead to a major accident event (MAE). |
14/09/2018 |
PTTEP Australasia (Ashmore Cartier) Pty Ltd |
Montara Venture |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
715 |
OHS Improvement Notice |
Inadequate management of the maintenance of electrical heat tracing equipment within a hazardous area |
13/09/2018 |
Esso Australia Resources Pty Ltd |
West Tuna |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
716 |
OHS Improvement Notice |
Failure to maintain electrical heat tracing resulting in a short duration fire associated with a crude oil pump in a hazardous area |
13/09/2018 |
Esso Australia Resources Pty Ltd |
West Tuna Kingfish B |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
717 |
OHS Improvement Notice |
Failure to maintain electrical heat tracing resulting in a short duration fire associated with a crude oil pump in a hazardous area |
13/09/2018 |
Esso Australia Resources Pty Ltd |
West Tuna Kingfish B |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
711 |
OHS Prohibition Notice |
Operating the Turbine Driven Centrifugal Gas Compressor with the exhaust ducting external surface temperatures exceeding acceptable limits in a hazardous classified zone. |
06/09/2018 |
PTTEP Australasia (Ashmore Cartier) Pty Ltd |
Montara Venture |
Closed |
|
|
707 |
OHS Improvement Notice |
Two workers received non-fatal electric shocks whilst working on an isolated 33kV high voltage interconnector cable installed between the CPF Ichthys Explorer facility and the Ichthys Venturer FPSO facility. |
12/07/2018 |
INPEX Operations Australia Pty Ltd |
CPF Ichthys Explorer |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
696 |
Environmental Improvement Notice |
Inadequate management of hydrocarbon levels in the open pile to prevent releases of hydrocarbon to the marine environment. |
13/03/2018 |
Esso Australia Resources Pty Ltd |
Tuna platform |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
694 |
OHS Improvement Notice |
Inadequate control of maintenance of safety critical equipment could lead to a loss of containment and major accident event (MAE). |
23/01/2018 |
Expro Group Australia Pty Ltd |
Ocean Monarch |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
695 |
OHS Improvement Notice |
Inadequate control of maintenance of safety critical equipment could lead to a loss of containment and major accident event (MAE). |
23/01/2018 |
Diamond Offshore General Company |
Ocean Monarch |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
692 |
OHS Improvement Notice |
Multiple failures in the safe management of work being conducted resulting in a live process pipe being cut with a reciprocating saw. |
20/12/2017 |
Esso Australia Pty Ltd |
Bream A |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
678 |
OHS Improvement Notice |
Risk of injury or death to personnel at the facility during well abandonment activities as a result of a loss of containment of hydrocarbons and the associated risk of fire and/or explosion. |
13/12/2017 |
Diamond Offshore General Company |
Ocean Monarch |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
679 |
OHS Improvement Notice |
Risk of injury or death to personnel at the facility during well abandonment activities as a result of a loss of containment of hydrocarbons and the associated risk of fire and/or explosion. |
13/12/2017 |
Diamond Offshore General Company |
Ocean Monarch |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
685 |
OHS Improvement Notice |
Risk of injury or death to personnel at the facility during well abandonment activities as a result of a loss of containment of hydrocarbons and the associated risk of fire and/or explosion. |
13/12/2017 |
Expro Group Australia Pty Ltd |
Ocean Monarch |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
675 |
OHS Prohibition Notice |
Personnel access to the turret area of the MODEC Venture 11 Facility. |
28/08/2017 |
Modec Venture 11 B.V. |
MODEC Venture 11 |
Closed |
|
|
673 |
OHS Improvement Notice |
Significant gaps in the implementation of the permit to work system, work place risk controls, training and competency and, inadequate supervision to ensure safe execution of work. |
17/08/2017 |
Inpex Operations Australia Pty Ltd |
CPF Ichthys Explorer |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
669 |
OHS Improvement Notice |
Risk of permanent, progressive and/or irreversible musculoskeletal disorders as a result of personnel working on structures attached to vibrating mechanical equipment. |
26/06/2017 |
Woodside Energy Ltd |
Vincent |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
663 |
Environmental Improvement Notice |
Failure to maintain trained and competent personnel resulting in an inadequate capacity to coordinate and manage an oil spill response as required by the accepted environment plan. |
21/06/2017 |
PTTEP Australasia (Ashmore Cartier) Pty Ltd (PTTEP AA) |
Montara Operations |
Closed |
|
|
666 |
OHS Improvement Notice |
Failure to take all reasonable practicable steps to ensure electrical equipment classified as "EX" is fit for purpose. |
25/05/2017 |
Esso Australia Pty Ltd |
Barracouta Offshore Platform Facility |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
656 |
Environmental Improvement Notice |
Failure to maintain trained and competent personnel resulting in an inadequate capacity to coordinate and manage an oil spill response as required by the accepted environment plan. |
17/05/2017 |
Santos Limited |
Mutineer-Exeter Development Field Operations |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
638 |
Environmental Improvement Notice |
Inadequate or poorly-implemented processes to obtain representative samples of spilt oil may result in failure, or unnecessary delays in the identification and exclusion of potential sources of a spill. |
19/04/2017 |
Esso Australia Pty Ltd |
West Tuna Platform |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
644 |
OHS Improvement Notice |
Failure to isolate the release of a significant volume of hydrocarbon gas resulting from an instrument line failure associated with a wellhead gas lift configuration. |
13/04/2017 |
Esso Australia Pty Ltd |
Various facilities |
Duty holder has informed NOPSEMA that the notices have been complied with |
|
|
640 |
OHS Improvement Notice |
Inadequate control of maintenance of safety critical equipment could lead to a loss of containment and major accident event (MAE). |
05/04/2017 |
Atwood Australian Waters Drilling Pty Ltd |
Atwood Osprey |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
641 |
OHS Improvement Notice |
Inadequate control of maintenance of safety critical equipment could lead to a loss of containment and major accident event (MAE). |
05/04/2017 |
ConocoPhillips Australia Exploration Pty Ltd |
Atwood Osprey |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
642 |
OHS Improvement Notice |
Inadequate control of maintenance of safety critical equipment could lead to a loss of containment and major accident event (MAE). |
05/04/2017 |
Halliburton Australia Pty Ltd |
Atwood Osprey |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
639 |
OHS Prohibition Notice |
Use of the surge tank, separator and steam heat exchanger for well testing |
29/03/2017 |
Atwood Australian Waters Drilling Pty Ltd |
Atwood Osprey |
Closed |
|
|
636 |
OHS Improvement Notice |
Increased risk of multiple serious injuries or fatalities due to loss of integrity of TEMPSC in a platform abandonment event. |
23/02/2017 |
Woodside Energy Ltd |
Goodwyn Alpha Facility |
Duty holder has informed NOPSEMA that the notice is complied wit |
|
|
631 |
OHS Improvement Notice |
Inadequate control of safety critical instrumentation and valves could lead to loss of containment and a major accident event. |
09/02/2017 |
MODEC Venture 11 B.V. |
MODEC Venture 11 |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
632 |
OHS Improvement Notice |
Inadequate control of safety critical instrumentation and valves could lead to loss of containment and a major accident event. |
09/02/2017 |
MODEC Venture 11 B.V. |
MODEC Venture 11 |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
623 |
Environmental Prohibition Notice |
Seismic sound exposure from the airgun array at levels that have been shown to cause negative biological effects to rock lobsters leading to an economic loss. |
11/11/2016 |
Origin Energy Resources |
Crowes Foot Marine Seismic Survey |
Closed |
|
|
620 |
Environmental Prohibition Notice |
An inadequate capability and capacity to respond to an oil spill from an uncontrolled release of petroleum resulting in short and long term biological, ecological and social harm. |
24/06/2016 |
Timor Sea Oil and Gas Australia Pty Ltd |
Northern Endeavour Floating Production Storage and Offloading Facility |
Closed |
|
|
617 |
Environmental Improvement Notice |
Petroleum activities subject to the local processes for change management may expose the environment to unidentified and unmanaged impacts and risks such as disruption to fishing effort, loss of catch, and/or significant impacts on matters protected under Part 3 of the Environmental Protection and Biodiversity Conservation Act 1999. |
24/12/2015 |
Woodside Burrup Pty Ltd |
Pluto 4D Marine Seismic Survey |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
616 |
OHS Improvement Notice |
Failure to put in place adequate arrangements for the evacuation of saturations divers to a place of safety in the event of an emergency. |
09/12/2015 |
Subsea 7 Australia Contracting Pty Ltd |
Seven Eagle |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
615 |
OHS Improvement Notice |
The operator of the facility could not demonstrate that it had reasonably assured the design, construction and installation of equipment and arrangements for towing the Self-Propelled Hyperbaric Lifeboat (SPHL) would protect the safety of divers. |
03/12/2015 |
Technip Oceania Pty Ltd |
Wellservicer |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
613 |
OHS Improvement Notice |
Increased health and safety risk to facility personnel is present, due to the lifeboats and muster stations not being afforded protection from credible blowout events. |
28/10/2015 |
Noble Contracting II GmbH |
Noble Tom Prosser |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
608 |
OHS Prohibition Notice |
Conducting hot work activities in hazardous areas. |
27/10/2015 |
Atwood Australian Waters Drilling Pty Ltd |
Atwood Eagle |
Closed |
|
|
609 |
OHS Improvement Notice |
The JSA (Job Safety Analysis) process applied did not provide sufficient detail for the workforce to fully understand the nature of the hazards and to identify the controls necessary for the management of the hazards and risks. |
27/10/2015 |
Atwood Australian Waters Drilling Pty Ltd |
Atwood Eagle |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
610 |
OHS Improvement Notice |
Permit to work procedures are not being followed to ensure that systems of work are safe and without risk to health. |
27/10/2015 |
Atwood Australian Waters Drilling Pty Ltd |
Atwood Eagle |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
605 |
OHS Improvement Notice |
Serious health effects that could lead to occupational noise-induced hearing loss to personnel undertaking work in, and in proximity to, the engine room, emergency generator room, mud pump room and starboard-aft area (where the air compressors, air dryers and BOP Control unit rooms are located) or where noise generating portable equipment is being used. |
11/09/2015 |
Noble Contracting II GmbH |
Noble Clyde Boudreaux |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
607 |
OHS Improvement Notice |
Serious health effects that could lead to permanent, progressive and irreversible vibration-induced white finger, carpal tunnel syndrome, musculoskeletal disorders, and/or neurological disorders, as result of personnel being exposed to hand-arm vibration due to using portable vibrating mechanical equipment. |
11/09/2015 |
Noble Contracting II GmbHv |
Noble Clyde Boudreaux |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
602 |
OHS Improvement Notice |
There is an increased risk of drowning of casualties from a helicopter crash or man overboard event at the facility. |
12/08/2015 |
MODEC Venture 11 B.V. |
MODEC Venture 11 |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
600 |
OHS Improvement Notice |
Personnel undertaking work in the firing line could not: demonstrate an effective understanding of the signals, alarms and shutdowns associated with their respective workstations; recall receiving formalised instruction; demonstrate actions they are required to undertake during an unplanned/uncontrolled pipe move; or recall any drills having been performed for an uncontrolled pipe moves at the facility. |
07/08/2015 |
Saipem (Portugal) Comercio Maritimo, Sociedade Unipessoal, LDA |
Castorone |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
601 |
OHS Improvement Notice |
The operator’s emergency procedures for unplanned/uncontrolled pipe moves do not adequately address the control of, and response to unplanned/uncontrolled pipe moves at the facility with respect to the risks to personnel that may be working in the firing line in close proximity to the pipe. |
07/08/2015 |
Saipem (Portugal) Comercio Maritimo, Sociedade Unipessoal, LDA |
Castorone |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
599 |
OHS Prohibition Notice |
Routine maintenance of the DP software system resulted in a vessel excursion that caused an unplanned pipe movement in the 'firing line', while workers were in close proximity to the pipe. No 'firing line' alarm or PA was sounded to alert personnel. |
30/07/2015 |
Saipem (Portugal) Comercio Maritimo, Sociedade Unipessoal, LDA |
Castorone |
Closed |
|
|
594 |
OHS Improvement Notice |
Internal corrosion of ex equipment in hazardous areas means that the equipment has the potential to be an ignition source which could result in fire and/or explosion in the event of a hydrocarbon release. |
22/07/2015 |
Quadrant Energy Australia Limited |
Stag CPF |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
595 |
OHS Improvement Notice |
Internal corrosion of Ex equipment in hazardous areas means that the equipment has the potential to be an ignition source which could result in fire and/or explosion in the event of a hydrocarbon release. |
22/07/2015 |
Quadrant Energy Australia Limited |
Stag CPF |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
596 |
OHS Improvement Notice |
Defects in Ex equipment which requires urgent rectification present potential ignition sources which could result in fire and/or explosion in the event of a hydrocarbon release. |
22/07/2015 |
Quadrant Energy Australia Limited |
Stag CPF |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
597 |
OHS Improvement Notice |
Essential/emergency electrical equipment that remains energised during an emergency shutdown condition represents a potential ignition source in the event of a hydrocarbon release. |
22/07/2015 |
Quadrant Energy Australia Limited |
Stag CPF |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
579 |
OHS Improvement Notice |
Serious or fatal injury from the potential exposure of a person to an object falling from height as a result of working underneath a suspended hose during the manoeuvring of a liquid hose to and from a supply vessel at the facility. |
04/06/2015 |
Esso Australia Pty Ltd |
Barracouta |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
580 |
OHS Improvement Notice |
Serious or fatal injury from the potential exposure of a person to an object falling from height as a result of working underneath a suspended hose during the manoeuvring of a liquid hose to and from a supply vessel at the facility. |
04/06/2015 |
Esso Australia Pty Ltd |
Bream B |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
582 |
OHS Improvement Notice |
Serious or fatal injury from the potential exposure of a person to an object falling from height as a result of working underneath a suspended hose during the manoeuvring of a liquid hose to and from a supply vessel at the facility. |
04/06/2015 |
Esso Australia Pty Ltd |
Cobia |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
583 |
OHS Improvement Notice |
Serious or fatal injury from the potential exposure of a person to an object falling from height as a result of working underneath a suspended hose during the manoeuvring of a liquid hose to and from a supply vessel at the facility. |
04/06/2015 |
Esso Australia Pty Ltd |
Flounder |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
584 |
OHS Improvement Notice |
Serious or fatal injury from the potential exposure of a person to an object falling from height as a result of working underneath a suspended hose during the manoeuvring of a liquid hose to and from a supply vessel at the facility. |
04/06/2015 |
Esso Australia Pty Ltd |
Fortescue |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
585 |
OHS Improvement Notice |
Serious or fatal injury from the potential exposure of a person to an object falling from height as a result of working underneath a suspended hose during the manoeuvring of a liquid hose to and from a supply vessel at the facility. |
04/06/2015 |
Esso Australia Pty Ltd |
Halibut |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
586 |
OHS Improvement Notice |
Serious or fatal injury from the potential exposure of a person to an object falling from height as a result of working underneath a suspended hose during the manoeuvring of a liquid hose to and from a supply vessel at the facility. |
04/06/2015 |
Esso Australia Pty Ltd |
Kingfish ‘A’ |
Duty holder has informed NOPSEMA that the notice is complied with |
|
|
587 |
OHS Improvement Notice |
Serious or fatal injury from the potential exposure of a person to an object falling from height as a result of working underneath a suspended hose during the manoeuvring of a liquid hose to and from a supply vessel at the facility. |
04/06/2015 |
Esso Australia Pty Ltd |
Kingfish ‘B’ |
Duty holder has informed NOPSEMA that the notice is complied with |