Document Hub
| Title | Type | Size | Date |
|---|---|---|---|
| Notes of meeting between Apache Energy Ltd, NOPSA and DoIR | 157.22 KB | 07/08/2012 | |
| Email thread between NOPSA, DoIR (WA) and Apache Energy Ltd regarding requests for information | 538.06 KB | 07/08/2012 | |
| Information publication scheme - Agency plan | 108.51 KB | 11/07/2012 | |
| the Regulator | Issue #3 2012 | 2.2 MB | 04/07/2012 | |
| Email from DoIR to Apache Energy Ltd enclosing meeting notes of meeting | 522.42 KB | 01/07/2012 | |
| the Regulator | Issue #2 2012 | 3.83 MB | 01/05/2012 | |
| Letter from Apache Energy Ltd to DoIR regarding request for information | 131.01 KB | 19/04/2012 | |
| Risks associated with 240V electric hand tools/equipment | 99.67 KB | 04/04/2012 | |
| the Regulator | Issue #1 2012 | 3.8 MB | 26/03/2012 | |
| Bypassing of storage tank features | 329.67 KB | 22/02/2012 |
Page last updated: