Pyrenees Facility Operations

Back to Search Subscribe

Activity name
Pyrenees Facility Operations
Activity types
Operation of a facility
Submitted by
BHP Billiton Petroleum (Australia) Pty Ltd
Submission date
03/07/2018
Submission type
Revision (5 Year)
Status
Accepted
Decision date
17/01/2019
Related documents
EP Summary (pdf 2.1 MB)
Link to previously accepted EP
Pyrenees Facility Operations

Location map (click to enlarge)
A618329
Progress bar
Submission
Assessment
Final decision
EP summary published
Activity started
Activity stopped
End of operation of EP
Activity events
Event Event date Next event* Next event due* Related documents
Submission of proposed revision to an accepted EP 03/07/2018 NOPSEMA decision 02/08/2018 Not applicable
Unable to make a decision within 30 days – complex assessment 30/07/2018 NOPSEMA decision 24/08/2018 Not applicable
Request for further information 22/08/2018 Titleholder action 21/10/2018 Not applicable
Submission of further information 23/10/2018 NOPSEMA decision 22/11/2018 Not applicable
Request for further information 22/11/2018 Titleholder action 13/12/2018 Not applicable
Submission of further information 18/12/2018 NOPSEMA decision 08/01/2019 Not applicable
Request for further information 08/01/2019 Titleholder action 22/01/2019 Not applicable
Submission of further information 10/01/2019 NOPSEMA decision 24/01/2019 Not applicable
Acceptance of EP 17/01/2019 Titleholder action 27/01/2019 Decision notification (pdf 174 KB)
Submission of new EP 24/01/2019 NOPSEMA decision 04/02/2019 Not applicable
Publication of EP summary 01/02/2019 Not applicable Not applicable

* The next event is based on NOPSEMA’s understanding and expectation of what may occur next in the assessment process. There are a number of other events that may occur, and events may happen sooner or later than expected. All events will be published in this table as and when they take place.

Activity description

The Pyrenees Facility produces crude oil from the Ravensworth, Crosby, Stickle, Tanglehead, Wild Bull and Moondyne reservoirs via a single stand-alone Floating Production Storage and Offloading facility (the Pyrenees FPSO). Associated activities conducted over the life of the EP include crude oil offloading, well management, inspection, maintenance and repair of all infrastructure, produced water reinjection, reinjection of gas into the Macedon formation, use of support vessels and helicopter operations.

The Facility is located in Commonwealth waters 45 km northwest of Exmouth, approximately 27 km northwest from the Muiron Islands, 13 km from the northern boundary of the Ningaloo Marine Park boundary (Commonwealth Waters) and 27 km north-west of North West Cape, in Western Australia. Production commenced from the Facility in February 2010. The water depth in the Pyrenees Facility Operational Area is approximately 200 m.

BHP will install a Compact Flotation Unit (CFU) module to further improve the quality of processed produced formation water. Produced formation water is a by-product of oil and gas extraction. The Pyrenees daily produced formation water volume is ~144,000 bbl/day. The CFU module will enable BHP to achieve significant improvements in the quality of processed produced formation water and enable increased capacity and life extension of the facility. Under this EP revision, during normal operations 7 per cent of the annual produced water volume will be discharged overboard. The volume limit for upset conditions will be reduced to less than 3% of the annual produced formation water volume discharged overboard, so that at least 90% of the annual produced water volume will be reinjected.

Regions
North West
Commonwealth waters adjacent to
Western Australia
Titles (or other instruments)
WA-42-L Opens in new window , WA-43-L Opens in new window
Contact

Natalee Connor

Specialist Government Regulations

125 St Georges Terrace

PERTH  WA  6000

Telephone: +61 8 6321 8585

Email: natalee.connor@bhpbilliton.com

Reference
4546

*Where an environment plan was submitted or accepted prior to 28 February 2014 certain information is not published, in accordance with the Environment Regulations in place at that time. For accepted EPs, refer to the attached EP Summary for additional information.